painting the lateral hinges with a protective inox coating.

 

 

All the tubes are identified .



 

 

cleaning the floor



 

 

Ivan was great in working inside the tail cone.. The tail needed to be checked and cleaned and he offered himself to do the job.. He's a little bit serious here.. the tube is the elevator control rod.



 


 

 

sdsd